The AL340 Temporary Tower System is a unique quick-deployed solution for telecommunications applications. This system is designed to meet the need for a low cost and quick solution for temporary and semi-permanent mining and construction operations. The tower is fully engineered and while it has a hinging design it also comfortably supports tower climbing.
Able to be set up in about an hour or two with a team of two, our tripod tower allows instant communications anywhere - no footing required. The bolt-together design means easy shipment to site, and the included winch allows raising and lowering of the tower eliminating the need for tower climbs.
This unique portable lattice tower consists of three bolt-together heavy duty galvanised outriggers, a 1.0 metre galvanised base, four 3.1 metre lattice sections, guy wires, anchor footings/skids, and a choice of headframe.
APAC's AL340 aluminium lattice modules feature three upright columns made from 50x4 CHS with 32x3 CHS lattice welded in between by certified boom welders, providing incredible strength while retaining a lightweight design. The three hinge feet are machined from 76.2 mm solid billet 6005 T5 aluminium, providing unmatched strength with precision machining ensuring perfectly distributed load across bolts and galvanised receptacle.
The AL340 Tripod Tower ships from APAC Infrastructure, located in the Sunshine Coast, Queensland.
Recommended Use
Capable of mounting a range of lighting, CCTV, sensors, and industrial monitoring equipment, this serviceable mast is incredibly popular in mining and construction where climbing structures can present a safety concern, eliminating the need for an elevated work platform or a certified tower rescue team to perform even simple adjustments.
This mast is also ideal for combination with wind turbines, providing high elevation with maximum stability allowing the establishment of temporary power generation at your exploration site, construction office, or hardstand.
Physical Specification
Material |
6005 T5 Aluminium Alloy, 50 x 50 mm, 2.5 mm wall SHS, AS 1163-C350L0
|
Finish |
Raw Aluminium, Hot dipped galvanised, Duragal to AS 4792
|
Dimensions |
9940 mm ⌀ (4470 mm outrigger length)
|
Weight |
290 kg
|
Qty | Components |
---|---|
1 | 1.0 m galvanised tripod base |
3 | Galvanised outrigger triangular sections (labelled A, B, C) |
3 | 1400 mm galvanised outrigger extension sections (labelled A, B, C) |
3 | 1500 kg rated levelling jacks |
1 | AL340 aluminium lattice base module (labelled 1) |
3 | AL340 aluminium lattice modules (labelled 2, 3, 4) |
1 | Pulley Block |
1 | Winch Assembly |
1 | Guy wire kit, pre-assembled |
1 | Gin Pole Assembly |
Supported Interfaces
The below table details how equipment may be attached.
Qty | Surface Type | Dimensions / Details |
---|---|---|
3
|
Pole
|
42 mm diameter, 3100 mm lengths, 340 mm face widths
|
1
|
AL340 Bolt Pattern
|
Attachment of AL340 Headframes
|
Documentation & Resources
About the Supplier
APAC Infrastructure are an Australian steel fabrication and machining company dedicated to the high technology and renewable energy industries. APAC are focused on developing high tech height systems based on sustainable and advanced processes to ensure Australian business remains globally competitive.